OTF1200XSVTC4 is a vertical tube furnace with a separated 4-channel gas flow and precision temperature station, which is designed for testing a small fuel cell ( 20 mm diameter up to 800ºC to develop new generation fuel cell material quickly and cost-effectively.
Flanges & Tubes ( Fuel Cell Fixture)
|
-
Φ20 mm small fuel cell ( customer provided) will be placed between tubes and flanges on the top and bottom ( Pic. left )
- Two tube sets consist of a dual-layer structure (Pic. 1)
- Outside tube: Alumina 20 OD X 16 ID x 260 L (mm) x 2 sets
- Inside tube: Quartz: 14 OD X 10 ID x 300 L (mm) x 2 sets
- Two flanges are connected to the tube sets with ports of the gas inlet and outlet and PTFE wires sealed top (Pic. 2)
- The tube set will be fixed on the frame of the furnace and apply pressure to a fuel cell. (Pic. 3)
- The included high-temperature adhesive will apply the gap between two tubes to ensure gas flow with air-tight. (Pic. 4)
 Pic. 1  Pic. 2  Pi. 3 Pic. 4
|
Vertical Furnace
|
- A compact Split-able furnace with 2 heating zones is installed on a mobile frame vertically.
- Power: AC110V or AC220 V is available, 1.5 KW.
- Working Temperature: Continuous: 1000oC, Max. 1200°C, 1 hrs
- Heating Zone Length: 2x 100 mm ( 200 mm total)
- Constant temperature zone: 65 mm with +/- 1oC
- Heating rate: 20 °C/min
- Temperature accuracy: +/- 1oC
- Two independent temperature controllers with 30-segment programmable
- Optional: Two furnaces on one frame are available upon request at an extra cost.
|
Temperature Control and Gas Delivery station
|
- Temperature and gas delivery control is located on a separate mobile cart via a touchscreen panel
- Temperature control: 30 segment programmable with +/- 1oC accuracy
- Four-channel MFC gas flow control with an accuracy of ±1.5% F.S
- Two MFC 100 SCCM max
- Two MFC 200 SCCM Max.
- Working temperature; 5~45ºC
- Warning: If you use flammable to test the fuel cell, you must add an automatic burner and a gas leaking detector to ensure safety ( click the picture below to order )
-
|
Accessories
|
- Accessories included:
- Two sets of flange and alumina+ quartz tubes are included with O-rings
- Two ss316 wires are included to connect to a metallic mesh disc (20 mm dia.)
- Accessories not included and provided by the customer or optional
- Au or Pt wire to connect the fuel cell in the center
- Two metallic mess to contact to a fuel cell ( optional for SS316 )
|
Compliance
|
- CE certified
- NRTL or CSA certification is available upon request at the extra cost
|