Features
|
- Easy touchscreen control
- Automatic assembly: assemble in sequence, injection of electrolyte, and sealing of cells
- Suitable for use in glove boxes and dry rooms ( Double-sided glove box is recommended)
- The amount of electrolytes and the number of injections are settable
- Equipped with a built-in vacuum pump
- Standard package for assembling half coin cell, while full cell assembly can be completed by replacing with customized feeding slots and switch operation mode in PLC software.
|
Power |
- Single Phase AC110V, or 220+10%V AC, 50/60 Hz, 200 W
|
Coin Cell
|
- For CR2032 coin cells and coin cells with 20mm Dia. Two material holding trays are included in the standard package
- The default assembling sequence is "Negative case, anode, separator, cathode, spacer, spring, and positive case".
- Other series of coin cells are available upon request, please contact MTI for more information.
- Different assembling sequences can be customized upon request.
|
Assembly Time |
- Approximately 65 seconds per cell
|
Loading Method |
- Pre-load material manually, then assemble coin cell automatically
|
Material Holding Tray |
|
Assembling Accuracy |
|
Sealing Pressure |
- Sealing pressure adjustable
- For the CR20 series coin cell, 500-700KG sealing pressure is recommended
|
Consumables size: |
Please click the pictures below to order all consumables: (1 bag of each following consumables are included for testing, 100 pcs/bag). To get the desirable electrode and separator size, please consider the customized cutting die with MSK-T10.
|
Cathode (14 mm)
|
Separator (16.2 mm)
|
Anode (15.2 mm)
|
Spacer (15.5mm)
|
Washer Spring (15.4 mm)
|
Case 2032
|
Pneumatic Pressure
|
- Input air pressure should be 60-80 psi.
- The connection tubing size is O.D. 8mm.
- An air compressoris highly recommended for pneumatic actions, but not included. pls order it from MTI or local stores)
- Note: If a gas cylinder is used instead of an air compressor(pic2), a two-stage pressure regulator(pic1) must be installed on the gas cylinder to limit the pressure within the required working range for safe operation. Click here to learn the installation of a gas regulator.
|
Injection Pump
|
- Equipped with a peristaltic pump with adjustable Injection volume
|
Electrolyte Jar |
- One glass-made electrolyte jar is included
- Capacity: 100ml Max.
|
Sealing Die |
- CR2032 sealing die is included in the standard package, other sealing dies are available upon request
- 5000 sealing times Max.
|
Operation Environment |
- If any oxygen or humidity sensitive substances are used (eg: Li metal anode, solid or liquid electrolyte), a glovebox or dryroom is required.
- Single-chamber glovebox VGB-6-LD should be considered, but dual-chamber VGB-6-II-LD will leave more spaces for operaiton.
|
Maintenance & Equipment Care
|
- Electrolytes are highly corrosive materials; therefore, the die set must be cleaned with ethanol after each experiment to avoid any corrosion damage.
- Please be aware that MTI is not liable for any losses/damages resulting from improper use, care and maintenance, or abuse of the product.
|
Application |
|